Work is progressing really well on the construction of the new renewable energy centre at Langarth.

Following the granting of planning permission for the scheme at the beginning of last year, members of the Langarth project team have been working with CORMAC and UK Power Solutions to construct the centre which will play a key role in delivering Cornwall Council’s climate change strategy and provide low cost green power for residents. 

energy centre 5 6

Located next to the park and ride, the energy centre will provide a central hub for electrical power to the site, bringing together on-site and off-site renewable energy.  It will be connected directly to the grid, giving both security of supply and allowing any excess energy to be exported.

sustainable development blog post 1

The site will include a transformer compound to house the electricity substation which will have a capacity of up to 24 megawatts. There will also be a battery compound which will maximise the use of renewable energy on the site for the benefit of Langarth residents and local businesses.

As well as helping to ease existing constraints on the national grid, we are working closely with the hospital to provide additional electrical capacity to support their immediate projects and future growth.

energy centre power network 1 1

 Heat pump technology, higher levels of insulation and solar panels will be used to power and heat homes, offices and other buildings, with electric vehicle charging points provided for every house.

renewable energy graphic 2

Together these measures will deliver net zero carbon homes with low running costs for residents, as well generating an income from the sale of surplus power back to the grid.

By ensuring a greater use of renewable energy created and used on site, and increasing  capacity to support the future use of electric vehicles, the centre will play a key role in helping Langarth, and the Council, to move away from carbon dependency.   

The buildings and compounds will be surrounded by a combination of stone gabion walls and planted green walls.  In keeping with the project’s green Garden Village ethos, wild flowers will also be planted around the buildings to enhance bio diversity and provide a variety of natural landscape features, as well as a number of new trees and a new Cornish hedge.  

energy centre 2

A new pedestrian footpath will connect the existing quiet lane to the park and ride and there will also be a viewing platform looking north over the energy centre, with descriptive maps of the garden village. Information boards and educational opportunities will be provided to describe the role of the centre and help people understand how future communities will be powered.